PROJECT PARAMETERS
• PROJECT TITLE: AFŞİN-ELBİSTAN COAL-FIRED POWER PLANT BLOCK B (EP2)
• CONTRACT SUM: 3.080.088,77 TL (2.298.573,71 USD) + VAT
• PROJECT SIZE: 265 Tons Steel Profiles, 9600 m Various Steel Pipes, 2500 m2 Ventilation Flaps and Grills
• LOCATION: Elbistan / K.Maraş / Turkey
• CUSTOMER: EÜAŞ – GTT Gama Tekfen Tokar Joint Venture (State-Owned Energy Company of Turkey)
• CONSTRUCTION PERIOD: 05.2002-12.2004
SERVICES
• High-Pressure Steam Piping
• Heat Exchanger Station for Cogeneration and Internal Heating Systems
• Sandblasting and Painting of Steel Pipes and Profiles
• Manufacturing of Rain Gutters from Steel Plates and Assembly of Steel Downpipes
• Ventilation Systems, Smoke and Heat Ventilation, Installation of Various Ventilation Flaps and Other Components
• Split & Multi Split Type Air Conditioning, VRF-Systems
• Sprinkler Systems, Fire Alarm Systems
• Process Water Supply Systems, Waste Water Pipe Systems, Sanitary Installations
• Various Steel Constructions