İçeriğe geç

PROJECT PARAMETERS

• PROJECT TITLE: AFŞİN-ELBİSTAN COAL-FIRED POWER PLANT BLOCK A (EP3)

• CONTRACT SUM: 425.000,00 TL (314.814,81 USD) + VAT

• PROJECT SIZE: 2000 m Seamless Steel Pipes, 1900 Stainless Steel Pipes

• LOCATION: Elbistan / K.Maraş / Turkey

• CUSTOMER: EÜAŞ (State-Owned Energy Company of Turkey)

• CONSTRUCTION PERIOD: 01.2006-10.2006

SERVICES

• Replacement of Heat Exchanging Stainless Steel Pipes in the Coal Combustion Chamber

• Installation of District Heating Pipeline between Power Plant and Neighboring Buildings

• 2000 m Ø300 Seamless, Isolated Steel Pipes